What is the truth behind the Twin Tower's demolition?

Asked 05-Sep-2022
Viewed 219 times

1 Answer


1

The Supertech twin towers in Noida, which were taller than the Qutub Minar, were demolished today at 2:30 p.m., nine years after residents filed a lawsuit alleging violations of building codes. They were destroyed with 3,700 kg of explosives.

Applied technology


For precise destruction, a 'waterfall implosion' approach was used.
This caused debris to fall like rain. The controlled detonation technique was used for the implosion. Edifice Engineering, based in Mumbai, worked with South African experts to demolish the building. Jet Destroyers
Inside the twin towers, 3,700 kg of explosives were placed. While Apex had 11 primary blast floors, Ceyane had ten. This demolition took about seven months to prepare.
The planning process began in February. In April, a trial was held.
The vibration from falling debris was reduced by using impact cushions.

Truth behind the Twin Tower's demolition

What is the truth behind the Twin Towers demolition

 

The Supreme Court ordered the demolition after the court found their construction on the Emerald Court society grounds to be in violation of norms. The buildings will be demolished at the company's expense under the supervision of the Noida Authority.
The original building plan for the 'Supertech Emerald Court' housing society showed 14 towers and nine floors. The plan was later revised, and the builder was permitted to construct 40 floors in each tower. According to the original plan, the area where the towers were built would be turned into a garden.

As a result, residents of the Supertech Emerald Court society filed a complaint with the Allahabad High Court in 2012, claiming that the construction was illegal. The petitioners contended that the Supertech group broke the rules in order to sell more apartments and increase their profit margins. As a result, in 2014, the court ordered the authority to demolish the towers within four months (at its own expense) of the order's filing.
The case was then heard by the Supreme Court. The court gave three months to demolish the towers last August, but it took a year due to technical difficulties. The Supreme Court found that the builder violated building codes in collusion with Noida authorities.

In fact, the buildings were actually brought down by controlled demolitions performed by explosives experts, who had been trained by the military.

The collapse of the towers was carefully planned and executed to ensure that it would look like a natural disaster.

What are the concerns about this demolition

 

The demolition of Supertech twin towers in Noida has caused great concern to the residents and the government. The Supertech twin towers were constructed in the year 2012 and have been given a five-star rating. They have been leased out to various companies. The demolition of these towers will affect the people living in Noida, Uttar Pradesh, India with its huge population who depend on these buildings for their livelihood. 

The first is the amount of dust produced by the demolition.
The second issue is debris removal, even though officials have stated that the rubble will be removed within three months.
Third, experts have expressed concern about windblown dust generated by the blast, which can remain in the air for weeks and cause health problems for those living nearby.

For one thing, there have been many complaints from residents who say that they have been given no notice about it happening. It also seems like there was very little time for them to find alternate housing before their homes were demolished.

Another concern is that due to the fact that construction on this new project has already started there will be less housing options available in the area once it is completed.