title: "Is India on track to meet its 2026 interim production targets under the National Green Hydrogen Mission?"  
description: "Is India on track to meet its 2026 interim production targets under the National Green Hydrogen Mission?"  
author: "Manish Sharma"  
published: 2026-09-18  
canonical: https://answers.mindstick.com/qa/117220/is-india-on-track-to-meet-its-2026-interim-production-targets-under-the-national-green-hydrogen-mission  
category: "Renewable Energy"  
tags: ["GreenHydrogen", "RenewableEnergy", "CleanTech", "IndiaEnergy", "CurrentAffairs2026"]  
reading_time: 1 minute  

---

# Is India on track to meet its 2026 interim production targets under the National Green Hydrogen Mission?

As part of the National Green Hydrogen Mission, India targeted setting up 5 million metric tonnes of green hydrogen production capacity per annum alongside 60-100 GW of dedicated renewable power. By 2026, early SIGHT scheme subsidies aim to bring the first wave of commercial electrolyser plants online.

## Electrolyser Manufacturing Bottlenecks

While domestic bidding for SIGHT manufacturing incentives was strong, developers face high capital costs and supply shortages for key stack components like proton-exchange membranes (PEM) and rare earth catalysts.

## Offtake Commitments

Fertilizer refineries and steel mills have been slow to sign long-term binding off-take agreements due to the current price gap between grey and green hydrogen.

What policy modifications or tariff protections could accelerate commercial adoption among heavy industrial power users this year?


---
