when ram mandir construction will complete

0 votes
81 views
pooja singh asked 05-Aug-2020 in History, Politics & Society by pooja singh

when ram mandir construction will complete

1 Answer

0 votes
Adriana Michele answered 12-Aug-2020 by Adriana Michele

when ram mandir construction will complete

CB Somapura, the chief architect of the Ram temple, has given an accurate estimate of the completion of the temple construction. The temple will be ready within two and a half to three years after the foundation stone.

According to him Shri Ramlala will sit on the ground floor. There will be Ram Darbar on the first floor. No one will be allowed to go on the floor above it. 
The pavilion has been reduced from three to five. The area has definitely been increased. The reason was the increasing number of devotees. It can be said roughly that the temple will now be two and a half times bigger than before.

If both the floors are accommodated together at one time, then about 10-12 thousand people will be able to see at once. The surface will be large. There about 6 to 8 thousand people will be able to see at once. At the same time, where there will be Ram Darbar on the first floor, 4-5 thousand devotees at once.